Project Name:
Stran-Hardin Arena for Adapted Athletics at the University of Alabama
Project Location:
Tuscaloosa, AL
Owner/Client:
The University of Alabama
Architect(s) of Record:
KPS Group, Inc.
60 14th Street South, Suite 100
Birmingham, AL 35233
Project Team:
Hugh Thornton AIA, Jasper Cornett AIA, Ronnie Collis AIA, Emily Bullard-McClellan AIA, Donna Dowling IIDA
Landscape Architect:
Bonner Lee
University of Alabama
Consultants:
University of Alabama Furnishings & Design / Interiors + FF&E: Leah Shepherd, Susanna Johnson, Courtney Oglesby
LBYD / Structural: Win Bishop & Elizabeth Key
Jackson Renfroe / Electrical & Lighting: Tim Cooke
Whitaker & Rawson/ Mechanical & Plumbing
Patrick Colllins, Daniel Whitaker, Erik Hartwig
LBYD/ Civil: Michael Hermecz
General Contractor:
Harrison Construction
Photographer(s):
All professional photography (large photos, slides 1-10 and small photos, slide 11) by Fred S. Gerlich Studio
Supporting action shots (small photos, slides 1-10 and large photo, slide 11) courtesy of KPS Group, Inc.