Project Name:
Stillwater Christian School
Project Location:
Kalispell, Montana
Owner/Client:
Stillwater Christian School
Architect(s) of Record:
100 Fold Studio
501 Blacktail Road
Lakeside, MT 59922
Project Team:
John Hudson, Ross Lackey, Tori Grosskopf, Garrett Morrison, Jennifer Smith
Consultants:
Jackola Engineering & Architecture, PC
Kingdom Builders Engineering, Inc.
General Contractor:
Swank Enterprises
Photographer(s):
Banks Nash (5, 7-10)
Josiah Brown (6)