Project Name: Protective Stadium
Project Location: 1898 9th Ave North, Birmingham, Alabama 35203
Owner/Client: Birmingham Jefferson Civic Center Authority
Architect(s) of Record:
Populous
4800 Main Street, Suite 300
Kansas City, MO 64112
Goodwyn Mills Cawood
2400 5th Avenue South, Suite 200
Birmingham, AL 35233
Charles Williams & Associates, Inc.
3601 8th Avenue South,
Birmingham, AL 35233
Studio 2H Design
1721 4th Avenue North, Suite 101
Birmingham, AL 35203
Project Team:
Yann Cowart, Senior Architect
Greg Magley, Architect
Rachel Crafton-Stiver, Architect
Erik Consuegra, Architect
Rachel Robinson, Interior Designer
Kevin Gokmen, Construction Administration
Landscape Architect: Macknally Land Design
Consultants:
Schoel Engineering, Civil Engineering
ME Engineers, Mechanical, Electrical and Plumbing
Hyde Engineering, Local Electrical
Walter P. Moore, Structural Engineering
MBA Engineers, Local Structural Engineering
WJHW, Audio/Visual Engineering
Bhate, Geotechnical Engineering
General Contractor: Brasfield & Gorrie
Photographer(s): Edward Badham, Slides 04-11