Project Name: Legacy Arena Renovation
Project Location:Birmingham, AL
Owner/Client:Birmingham Jefferson Civic Center Authority (BJCC)
Architect(s) of Record:
POPULOUS
800 Main Street, Suite 300
Kansas City, Missouri 64112
CCR Architects & Interiors
2920 1st Ave S
Birmingham, AL 35233
Studio 2H Design
1721 4th Ave N #101
Birmingham, AL 35203
CWA Architects
3601 8th Ave S
Birmingham, AL 35222
TRI Architecture
2627 Aberdeen Road
Birmingham, AL 35223
Project Team:
- Jim Swords
- Tammy Cohen
- Angela Nash
- Robert Bruner
- Christa Vandiver
- Theresa Rivadeneira
- Ashley Askew
- Kayla Bailey
Landscape Architect:Macknally Land Design
Consultants:
Civil-
- Schoel
- Dynamic Civil Solutions
Structural Engineers-
- MBA Engineering
- Walter P Moore
- Structural Evolution
Plumbing Engineers-
- ME Engineers
- Mechanical Engineers-
- ME Engineers
- EDT Engineering
Electrical Engineers-
- ME Engineers
- Hyde Engineering
Audio/Visual-
- WJHW
- Kitchen/Food Service-
- The Bigelow Company
- Fire
- SSOE Group
- Howe Engineers
General Contractor: BL Harbert International
Photographer(s): Liesa Cole, Studio Goodlight