Project Name: Coca-Cola Amphitheater
Project Location: Birmingham, AL
Owner/Client: Birmingham-Jefferson Convention Complex (BJCC)
Architect(s) of Record: Generator Studios
Project Team:
- John Iiams – Generator Studios
- Joseph Vizurraga – Generator Studios
- Greg Magley – Goodwyn Mills Cawood
Landscape Architect: Macknally Land Design
Consultants:
- Live Nation (Operator)
- Goodwyn Mills Cawood (Assistant Architect)
- Studio 2H ((Assistant Architect)
- Schoel Engineering (Civil)
- MBA Engineers (Structural)
- MW/Davis Dumas & Associates (MPF)
- CCE (Electrical)
General Contractor: Stone Building Company
Photographer(s):
Evan Joseph Studio (Slides 1, top of 2, 4, 5, bottom left of 6, top of 7, 8)
Live Nation (Slides bottom of 3, 4, top left of 6, top right of 6, bottom right of 6, bottom of 7)




